- Post by Admin on sunday, March 05, 2015

Electricity generation on
Wednesday rose to 4,232.6 Megawatts (MW), an appreciable improvement from the
3,500 MW recorded in the last two months, according to the daily electricity
generation report from the Transmission Company of Nigeria (TCN).
The Federal
Government's efforts to fix the electricity crisis in Nigeria have not yielded
significant result due to gas pipeline vandalism and many homes and businesses
are still experiencing constant blackout.
According to the
operational report from the TCN, this can be regarded as significant
improvement; although still far below the country's peak demand forecast of
19,100MW. Also, analysis from the Nigerian Electricity Supply Industry (NESI)
Statistics showed that the power sector lost an estimated N1.2 billion on March
20, due to gas constraints. Specifically, the agency put power output loss to
gas constraints at 2,105MW.
Written by admin
View all posts by: admin